


Swiss Dot Top
by Nash Knits
This pattern is in the Knit&Note app, where you can plan and track every project.





Join 300K+ knitters
Swiss Dot Top is knitted top down, starting with the back yoke which is worked into two halves to form the slit, then joined together and knitted back and forth till the back yoke is finished. After that sts are picked up across the shoulders to form the front yoke, then the body is worked in the round till waist. A peplum is worked in the round, then both upper body piece and peplum are grafted together using 3 needles bind off technique to form a seam. Stitches for short sleeves are then picked up across the armholes and worked in the round. Finally, ruffles are knitted and grafted to the sleeves using 3 needles bind off technique.
Read more
Sizes
0-3 months, 3-6 months, 6-12 months, 12-18 months, 18-24 months, 2-3 years, 3-4 years, 4-5 years, 5-6 years
Yarn
Safran by Drops · 150 to 300 g
Needles
2.5 mm (80 cm), 3 mm (80 cm), 2.5 mm, 3 mm
Gauge
26 sts = 10 cm
Pattern language
English
Size chart
Everything for Swiss Dot Top in one place.
1
Download Knit&Note
Find Swiss Dot Top in the pattern library.
2
Tap Start project
Cast on when you are ready. The pattern is saved to your projects.
3
Knit at your own pace
Your count, notes, yarn and knitting time stay with the project.

Nash Knits
Swiss Dot Top
Start project
Plan project
Description
Swiss Dot Top is knitted top down, starting with the back yoke which is worked into two halves to form the slit, then joined together and knitted back…




